Power Grid: Québec/Baden-Württemberg Expansion

Expansion till Power Grid


Antal spelare: 2 - 6
Speltid: 120 minuter
Rekommenderad ålder: från 13 år
Läs mer på Boardgamegeek
Referens: RIO479

The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.

In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.

In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins.

199 kr
Ej i lager

Ett av skandinaviens bredaste spelutbud med över 60.000 olika artiklar i lager

Fraktfritt inom Sverige från 1500kr (gäller ej skrymmande varor)

Spelrum med över 100 sittplatser och aktiviteter varje kväll

 Recensioner på Facebook:
 4,9 av 5
Följ oss på Facebook

Recensioner på Google:
 4,8 av 5
Läs våra recensioner