Power Grid: Québec/Baden-Württemberg Expansion
Expansion till Power Grid
Antal spelare: 2 - 6
Speltid: 120 minuter
Rekommenderad ålder: från 13 år
Läs mer på Boardgamegeek
The two maps included in Power Grid: Québec & Baden-Württemberg were previously released in two separate Power Grid base games: Québec is part of Mégawatts, the French edition of the game released by Filosofia, while Baden-Württemberg was included in Funkenschlag: EnBW, a German edition of the game from EnBW.
In Québec, the Canadian province Québec places great emphasis on energy production via ecological hydro power plants. Once an ecological power plant has been added to the power plant market, it will not be put on the bottom of the deck even if it is the highest plant - the highest non-green plant is put on the bottom instead. The two cities of Montreal and Québec City offer several cheap connections, making this map challenging with several layers of decisions for building the best networks.
In Baden-Württemberg, the clocks move differently: The main change focuses on the order of phases of a game round. First, you buy power plants, then you rearrange the player order. Furthermore, as this province is small, several transregional locations may only be connected once Phase 2 begins.
Relaterade produkter
Kunder som köpte denna produkt handlade även
Ett av skandinaviens bredaste spelutbud med över 60.000 olika artiklar i lager
Fraktfritt inom Sverige från 1000kr
Spelrum med över 100 sittplatser och aktiviteter varje kväll
Recensioner på
Facebook:
4,9 av 5
Följ oss på Facebook
Recensioner på Google:
4,8 av 5
Läs våra
recensioner